Make sure the outer edge extends over the gutter.
Roof drip edge installation instructions.
To install a drip edge on a newly constructed roof or on a re roofing job attach the drip edge along the roof s eaves first.
Step 5 install drip edge straight pieces install membrane over drip edge per membrane manufacturer s installation instructions.
Let s face it many homeowners may not be aware of what a roof drip edge actually is or what it does for a roof and if they are aware they may be talked out of installing it because of cost factors involved with roof replacement or repairs.
Overlap two pieces of flashing that meet end to end by at least 1 inch.
Slip the wide flat flange of the material all the way under the first course of roof shingles as illustrated.
Water under shingles is damaging.
Step 6 install approved roofing membrane note 1.
Install the drip edge by fitting it on the roof eave pushing it tightly against the edge of the plywood and nailing or screwing it down.
The problem is that a drip edge is technically supposed to be part of any shingle roof manufacturer s installation instructions and the process is.
Find and fix a leaking roof.
The best way is to install the roof drip edge only along the eaves first then place ice and water barrier in the snowbelt or felt paper underlayment over the drip edge.
To see how the pros install please watch the video below.
While the vertical leg should be placed 1 4 1 2 away from the fascia.
The roof leg should extend a minimum of 2 back onto the roof sheathing.
Asphalt shingles should overhang the exterior edge of the drip edge by to inch.
12 roof repair tips.
Isolate all metal components from acq treated wood or other galvanically incompatible material with appropriate membrane material.
On the rakes the drip edge goes over the membrane so the roofers apply the membrane first.
Space the fasteners by about 12 inches.
If it doesn t pull the drip edge out slightly from under the shingles.
How to install a drip edge.
Now that you know where to install a roof drip edge you can install.
This lets any water that gets on the roof run down the underlayment and over the drip edge.
Secure the drip edge with roofing cement.
If water now gets under the shingles it can cause short term staining and long term deterioration of the lowest edge of the roof deck and along the top of the fascia board.
Apply a continuous bead of cement along.
The drip edge is nailed in place using 1 1 2 galvanized roofing nails.
Use 1 inch galvanized roofing nails or 3 4 inch exterior screws.