Installation procedures product and safety standards.
Roof installation interply void tolerance.
Pitched roof systems sometimes merge into vertical facade vegetative techniques.
Installation but they grow with time.
Moisture trapped in the void expand.
Roof tiles broken by foot traffic should be.
Section 3 truss installation 3 1 general 3 2 set out 3 3 lifting 3 4 first truss 3 5 subsequent trusses 3 6 erection bracing and tolerances section 4 roof bracing 4 1 general 4 2 battens 4 3 top chords 4 4 bottom chords 4 5 webs 4 6 top hat construction section 5 truss connections 5 1 hip ends 5 2 girder 5 3 gable end trusses.
New york city hall used copper for roofing circa 1764 a copper roof was used on the rebuilt old senate chamber in 1819.
Figure 2 poor interply bonding due to low application temperature a cap sheet b base sheet.
Roof traffic in an effort to avoid the inherent danger associated with walking on a roof we recommend that only licensed and insured professional contractors traverse roofs.
When reroofing remove all prior roofing materials down to a clean debris free substrate and properly close off all abandoned roof penetrations.
The pressure developed in the void stretches.
Ensure all products are appropriate for the installation environment and array under the site s loading conditions.
Apply over clean dry dust and debris free substrates.
Prime concrete decks prior to application with pg 100 asphalt primer.
Comply with all applicable local or national building and fire codes including any that may supersede this manual.
During installation of hot bituminous systems care warns that improper mopping can produce voids in the membrane block drains and result in ponding water as well as void the warranty.
Roofing membranes for low slope application.
Replaced in a 1900 renovation the slate roof on the white house was replaced with sheet iron in 1804 the copper roof on the old church of christ in philly lasted from the 1830s to 1967.
To install extensive vegetative roof covers on pitches steeper than 2 5 12 12 degrees supplemental measures will be required to prevent sliding instability.
Remove debris contaminants aggregate or loose surfacing from the surface of the membrane or flashing to be repaired.
Pierce cautions that before roof repairs are hastily made the source of the ponding water should be investigated.
Additional membrane s sheet to complete the roofing system.