Always called them wrinkles or blisters or fish mouths depending on how big they were.
Roof mole runs.
Start on lowest row of shingles and work your way backwards to the upper part of the roof.
Monolithic used to describe something without seams.
Kee stone stands out above the rest.
Protect your building with the industry s highest performing thermoplastic kee roof membrane kee stone fb 60.
When the mole enters the device it makes it halfway through this loop before brushing against the trigger.
In severe cases the wrinkles or mole runs can compromise the watertightness of laps and can result in leaks.
The wire loop then accelerates upward crushing the mole against the trap s curved roof.
Roof is currently watertight but entire surface numerous mole runs.
1 that portion of the flashing that is attached to or rests on the roof deck to direct the flow of water on the roof or to seal against the roof deck.
This lack of ventilation prevents the moisture from exiting the attic space.
Mole run a meandering ridge in a membrane not associated with insulation or deck joints mop and flop a procedure in which roofing elements insulation boards felt plies cap sheets etc are initially placed upside down adjacent to their ultimate locations are coated with adhesive and are then turned over and adhered to the substrate.
If a roof is poorly ventilated and in many cases not ventilated at all moisture will build up in the attic.
This action causes buckling that can be seen through the roof shingles.
If the membrane is too cold at time of installation it may wrinkle develop mole runs that could be visible through the shingles when the roof warms up.
Some of the other reasons could be out of round as was suggested.
Never heard that term before.
Latent moisture in the product poor substrate conditions containing moisture.
2 a material applied to the base of a wall extending above a roof as a protection for the junction of the wall and the roof.
Formed from a single material.
You may need to use poison peanuts as a first treatment.
Continue spraying until you see runoff then let the chemicals sit for 15 20 minutes to soak in and begin attacking the mold.
These conditions are reffered to in the roofing trade as mole runs on built up installations and are caused primarly by moisture in the product when applied with a hot asphalt application.
Mole run a term used to describe a ridge in a roof membrane that is not the result of improper deck or insulation joints.
This will prevent the solution from draining in your direction.