Of sheet is strips of the membrane can also be used as stripping.
Roofing ice guard installation.
If you have a more complicated roof with valleys skylights dormers vent pipes or chimneys it s a good idea to have ice and water shield installed in and around these areas as well as along the eves.
One person can install long lengths of ice and water shield to the roof however it is easier for two people to install especially with some new installation tricks.
Once in place follow by flashing the rakes.
Ice and water protector needs to be installed directly onto the roof deck after you have placed the drip edge at the.
Install the ice barrier membrane according to the manufacturer s instructions with the drip edge installed on top of the membrane.
How should ice and water protector be installed on a roof.
A roofing ice guard is a thick rubber membrane that is applied directly to the wooden deck of a roof prior.
Here s how proper installation of grace ice water shield the conventional method.
Cut the membrane into 10 15 ft 3 5 m lengths and reroll loosely.
What is roofing ice guard.
Around roof features like.
Cut the membrane into 3 5 m 10 15 ft lengths and re roll loosely.
Apply roof covering material at temperatures of 40 f 5 c or higher.
Install waterguard rain ice first in roof valleys see instructions below and as a flashing membrane at roof to wall transitions around vents curbs skylights and other roof penetrations.
An ice guard is put into place to prevent water from melting snow and ice from leaking through the roof.
Peel back 1 2 ft 300 600 mm of release liner align the membrane and continue to peel the release liner from the membrane.
Then apply along the eaves.
If installed properly this reliable roofing underlayment can save homeowners 18 000 in reroofing costs.
Peel back 300 600 mm 1 2 ft of release liner align membrane.
You should install ice and water protector before other underlayments including roof felt.
Press the membrane in place with heavy hand pressure.